T
Tesco Full EDI document cycle
🇬🇧 UK 🇮🇪 ROI

Tesco EDI,
handled correctly.

Supply Lens automates the complete Tesco EDI document cycle: purchase orders in, acknowledgements and despatch advice out, invoices submitted: all mapped to your ERP or IMS with Tesco's exact depot codes, GLNs and compliance rules built in.

Orders in
Purchase orders handled automatically
Every Tesco PO lands in your ERP without manual intervention
UK & ROI
Both markets, kept separate
Tesco UK and Tesco Ireland run as distinct configurations: no cross-contamination
No deductions
Invoices checked before they're sent
Price and quantity validated against the original PO: issues flagged your side first
99.9%
Uptime SLA
Monitored 24/7: orders never miss their transmission window
Supply Lens — Tesco Live Flow Live
Tesco PO TES-2025-94417 received 48× 5000441223311 · 24× 5000441223328 · RDC DC47 PO IN
EANs mapped · depot resolved DC47 → Bristol RDC · GLN 5029667155517 matched · supplier 00441 PROCESSING
Sales order SO-11604 created ERP / IMS · 72 units · ref TES-2025-94417 CREATED
Acknowledgement sent to Tesco All 2 lines accepted · delivery confirmed wk 22 ACK SENT
Despatch advice + invoice transmitted Pallet labels generated · pallet label PAL-8841 · £1,188.00 ASN + INV
Tesco-Specific Requirements

Tesco has precise
requirements for suppliers.

Tesco's EDI compliance is not generic: GLNs, pallet label pallet labels, depot routing codes and booking-in windows all need to be correct before your first delivery is accepted. Supply Lens is configured for Tesco's specific rules, not a generic EDI template.

GS1 GLN identifiers

Every Tesco location: RDC, depot or store: has a GS1 Global Location Number. Supply Lens maps Tesco's GLNs to your internal warehouse and customer references so documents route correctly every time.

pallet label pallet labels

Tesco requires compliant pallet labels on all pallets. Supply Lens generates the pallet label references as part of the despatch advice: so your despatch advice and physical labels are always in sync.

RDC depot routing

Tesco's UK network routes through Regional Distribution Centres: Daventry, Hinckley, Livingston, Magor and others. The correct RDC is determined per order and mapped in the despatch advice so deliveries arrive at the right location.

EAN-to-item code mapping

Tesco identifies products by GS1 EAN / GTIN. Supply Lens maintains a cross-reference table mapping Tesco EANs to your own product or item codes: so the PO lands correctly in your system regardless of the code Tesco sends.

Invoice tolerance rules

Tesco applies strict invoice matching rules: price, quantity and date tolerances must be met. Supply Lens checks invoice values against the original PO and flags discrepancies before submission, reducing deductions and charge-backs.

Tesco ROI specifics

Tesco Ireland operates as a separate trading entity with its own GLNs, supplier codes and document routing. Supply Lens handles UK and ROI as distinct configurations: the same integration supports both without mixing data or references.

Document Flow

Every document.
Every direction.
Automatically.

Supply Lens handles the full Tesco EDI message set, inbound and outbound, so no document is ever manually produced, re-keyed or sent late.

  • Purchase orders received and validated
  • Order acknowledgements sent automatically on sales order creation
  • Despatch advice sent with pallet label references on despatch
  • Invoices submitted with the correct Tesco GLN and tax treatment
  • Functional acknowledgements handled where required
  • Credit notes raised and transmitted when returns or claims occur
  • All documents formatted to Tesco's document specifications
Tesco document cycle
Purchase Order IN
Tesco EDI
Order Acknowledgement OUT
Tesco EDI
Despatch Advice / ASN OUT
Tesco EDI
Invoice OUT
Tesco EDI
Credit Note OPTIONAL
Tesco EDI
Depot & Location Mapping

Every Tesco RDC
mapped to your
warehouse reference.

Tesco routes deliveries through its Regional Distribution Centre network. Each RDC has its own depot code and GLN. Supply Lens maps these to the correct destination in your ERP or IMS: and keeps the mapping updated when Tesco changes their depot codes.

  • All UK Tesco RDC codes pre-configured
  • Tesco Ireland (ROI) depot codes maintained separately
  • Tesco store GLNs supported for direct-to-store deliveries
  • New or changed depot codes updated without disrupting live orders
  • Multi-destination orders split and routed correctly per line
Depot code mapping: example
Tesco code RDC location Market
DC11 Daventry RDC UK
DC18 Hinckley RDC UK
DC34 Livingston RDC UK
DC47 Bristol RDC UK
DC52 Magor RDC UK
DC71 Donabate RDC ROI
DC74 Midlands RDC ROI
Configuration

Configured for
Tesco. Connected
to your system.

Supply Lens holds Tesco's rules so you don't have to. Your team provides credentials, product mappings and confirms your depot routes: everything else is handled at the Supply Lens layer.

1

Tesco supplier onboarding

Your Tesco supplier number, GLN and EDI connection details (connection credentials and endpoints) are captured and configured as the inbound/outbound channel.

2

EAN / product cross-reference

Tesco EANs mapped to your item codes. We handle cases where the same EAN maps to different items by pack size, unit or promotional variant.

3

Depot and entity routing

Each Tesco RDC code mapped to your correct warehouse, customer account or entity. UK and ROI configured as separate routing paths where applicable.

4

pallet label and pallet config

Your GS1 company prefix registered. pallet label generation configured to your pallet spec, whether single-product, mixed or layer pallets, so labels and despatch advice match exactly.

EAN → item code cross-reference
Tesco EAN / GTIN Your item code
5000441223311 CHOC-DARK-100G
5000441223328 CHOC-MILK-100G
5000441223335 CHOC-WHITE-100G
5029667155517 GLN:SUPP-00441
Order ingest
Direct or VAN
ON
Acknowledgement auto-send
On SO creation
ON
Despatch advice + labels
On despatch
ON
Invoice
On despatch
ON
Tesco ROI
Separate entity
CONFIG
Exception queue
Email + dashboard
CONFIG
Tesco Edge Cases

The situations that
catch suppliers out.

Tesco's EDI compliance requirements are strict. Supply Lens handles the scenarios that typically cause rejections, deductions or failed deliveries.

"Tesco sent a PO with an EAN we haven't mapped yet: it's a new product line."

Unrecognised EANs go to an exception queue immediately. The PO is held, your team is notified with the full context, the mapping is added and the order is re-triggered. No silent drop, no delayed acknowledgement that breaches Tesco's response window.

"We shipped 44 cases but the PO was for 48. The despatch advice needs to show what actually left the warehouse."

Partial despatch is handled cleanly. The despatch advice reflects the actual quantity shipped with the correct pallet label references. The acknowledgement can be configured to acknowledge the original quantity or the confirmed quantity: depending on Tesco's expectation for your account.

"We supply both Tesco UK and Tesco ROI: they keep getting mixed up in our system."

UK and ROI are maintained as completely separate trading partner configurations in Supply Lens — different GLNs, different supplier codes, different depot routing, different document series in your ERP. The integration keeps them isolated so they can never cross-contaminate.

"Tesco raised a deduction because our invoice price didn't match the PO to the penny."

Invoice values are validated against the original PO price and agreed price lists before submission. Discrepancies are flagged before the invoice is sent: giving your team the chance to correct or query rather than receive a Tesco charge-back weeks later.

Getting Set Up

What you need
to go live with Tesco.

Tesco EDI onboarding involves their supplier team, your EDI connection and your internal product and depot data. Supply Lens manages the configuration: you provide the inputs.

  • Tesco supplier number and GLN
  • EDI connection details: your connection credentials and endpoints
  • GS1 company prefix (for pallet label generation)
  • Product EAN list with your internal item codes
  • Depot routing confirmation: which RDCs you supply
  • ERP or IMS credentials (Unleashed, Enterpryze or other)
  • Sample Tesco POs (real examples where available)
  • Tesco ROI details if applicable: separate supplier code and GLN
  • Invoice price list / agreed pricing for validation rules
Typical delivery timeline
Day 1

Supplier data & credentials

Tesco supplier number, GLN, EDI connection, GS1 prefix and ERP credentials received

Day 2–3

Mappings built

EAN cross-reference, depot routing and pallet label config completed in staging

Day 4–5

End-to-end test

Test PO processed · acknowledgement, despatch advice, invoice validated against Tesco spec

Live ✓

Go live

Production enabled · first live Tesco PO processed end-to-end

ERP & IMS Connections

Connect Tesco to your back-office system.

Supply Lens routes Tesco POs directly into Unleashed, Enterpryze or other connected ERPs: with the right item codes, document series and depot mapping for each.

Ready to automate
your Tesco EDI?

Most suppliers are live within 5 days. No long contracts. We handle the Tesco-specific setup: you just confirm the mappings.